SALT PRODUCTION FACILITY
When a major salt production facility needed a pump station for their process, they considered their alternatives in a highly corrosive environment. Their decision was a heavy-duty galvanised steel frame with FRP stairs, flooring and handrails.
FRP Engineering Pty Ltd succeeded in securing to contract to:
The client was able to take the pump station (disassembled) to site, and then install it confident in both the product (with its superior corrosion resistance) and the fabrication.


Address
Unit 2, 28 Baile Road
Canning Vale
Western Australia 6155
Contact
P. +61 8 9455 4343
F. +61 8 9455 4373